Equipment

Wire drawing machine

Wire drawing machine

Slitting warper

Slitting warper

Projectile weaving machine

Projectile weaving machine

Filling Method

Underwater filling Shore filling

Advantage introduction

The CBJC scientific research team lasted two years to upgrade the three-dimensional weaving process of geotechnical pipe bags for environmental protection dredging, greatly reducing the influence of the external water flow pressure of the pipe bag on the mud drainage in the pipe bag during underwater filling, and the water in the pipe bag can still be fast. When the silt particles are discharged, the silt particles settle quickly to form a solid bag under water. The height of the tube bag can be blow-filled up to 3 meters. This process can largely solve the problem of using silt to fill the dam where there is no sand source on the construction site. The working conditions of body and underwater dredging.

Telephone

Customized service hotline

+86-135 8533 6413

视频标题
Filling method of geotechnical tube bag
Filling method of geotechnical tube bag

Advantage introduction

The CBJC brand environmentally-friendly high-strength geotechnical pipe bag is completely independently developed by the company and has obtained a national invention patent. Its use characteristics are: during use, as the base cloth is stressed, it can maintain a relatively fast water flow rate in a three-dimensional permeable manner. It fundamentally solves the problems of no water or slow water output and mud leakage due to the clogging of the bag body due to sludge in the filling process of conventional geobags. The product has low requirements on the construction site, no pollution, low construction cost, convenient construction, and has no impact on the lives of surrounding residents. The molding height can reach 3 meters, and the cost is high. The company can provide more economical and effective design and use of geotechnical pipe bags.

Telephone

Customized service hotline

+86-135 8533 6413

视频标题
Filling method of geotechnical tube bag
Filling method of geotechnical tube bag

Application

Phase I Project of Taihu Lake Dredging and Silting Wetland Belt in 2021

Phase I Project of Taihu Lake Dredging and Silting Wetland Belt in 2021

2020~2021 Putian Mulan Creek Soil Sea Dredging Project

2020~2021 Putian Mulan Creek Soil Sea Dredging Project

Heze Black and Odorous Water Body Treatment Project in 2020

Heze Black and Odorous Water Body Treatment Project in 2020

Partners

Partners
Partners
Partners
Partners

Product Search

Hot keywords: container bag | environmental protection substrate | car interior

%{tishi_zhanwei}%